A Leader in Reconditioning
ENGINE COMPONENTS
Our component restoration and exchange services include cylinder heads, intercoolers, water pumps, connecting rods, oil pumps, oil coolers and turbos. Thorough cleaning, precision machining and expedited shipment back-up the quality of our work.
Cylinder Head Rebuilding
Our cylinder head rebuilding services include:
- Cylinder heads reconditioned to BEYOND OEM specifications – our valve seats don’t need to be “broken” in
- Precision in workmanship
- Excellent cleaning and blasting
- Crack inspection and hydrotesting
- CNC machining of valve seats/guides
- New parts supplied
- Custom design/builds for special projects
- Assembly data recorded
- Paint and preservation
- Packaging for shipment
Intercooler Reconditioning
Our intercooler reconditioning services include:
- Professional cleaning and repair
- Arrival inspection and test of integrity
- Complete Disassembly
- Ultrasonic cleaning of core
- Blast/clean air side and coolant covers
- Assemble, reseal and hydrotest
- Paint and package
- New core/fin pack available for some cooler
- Installation and mounting gasket kits
Water Pump Rebuilding
We provide complete water pump reconditioning services:
- Complete disassemble, clean and inspect
- Pump housing dry and wet/slurry blasted
- Crack check pump housing
- Impeller wet blasted and inspected for cracks
- Pump shaft and impeller checked for balance
- Pump assembled with new components: pump shafts, bearings, seals (mechanical and oil), O-ring
- New impeller
- Drive gear
- Installation gasket kit
Connecting Rods
Our connecting rods services include:
- Recording serial IDs for protocol inspection
- Precise ultrasonic cleaning
- Parting surfaces inspected for imperfections
- NDT crack inspection
- Strict measuring procedures for all checks
- Alignment, sizing, ovality, conicity, CC
- Resizing big ends
- New small end bushes installed
- New rod bolts
- Data recorded
- Preservation and packaging
Oil Pumps / Coolers
Our oil pumps/coolers services include:
- Lube oil system components
- Oil pump reconditioning
- New bearings/bushes installed
- Recondition gears/shafts
- Crack check
- Clearance inspection
Oil cooler reconditioning:
- Disassemble cooler
- Ultrasonically clean tube bundle
- Clean shell side and heads
- Assemble with new seals
- Pressure test
- Paint and package
Options:
- Installation gasket kits


